A kitchen and bath remodeling checklist should cover budget, layout, materials, permits, and a realistic timeline before demolition begins. In Chicago, older building stock adds plumbing and electrical considerations that newer construction doesn't share, and a minor kitchen remodel remains one of the few projects that returns more than its cost at resale. I built this checklist at Alice Benjamin Interiors to give Chicago homeowners a clear, informed starting point before they meet with a contractor.

Budget and intent come first, before paint chips or tile samples. At Alice Benjamin Interiors, I ask clients how they use a space, not just how they want it to look. This is also when I bring in bathroom and kitchen remodeling contractors in Chicago who specialize in the trade work involved, so the plan is grounded in what's buildable before any material is chosen.
Set your budget before your Pinterest board. Chicago's vintage housing stock, from Lincoln Park greystones to Gold Coast high-rises, often carries older plumbing and wiring that must be addressed before cosmetic work begins. A minor kitchen remodel returned about 113% of its cost at resale nationally, according to Zonda's 2025 Cost vs. Value Report, one of the few interior projects that pays for itself. Build a 10 to 15% contingency into any Chicago kitchen remodeling budget for what a vintage building may reveal once walls open.
Before you compare bathroom remodeling, use this list to evaluate any proposal, whether it comes from a design-build firm or an independent tradesperson.
Bath design keeps shifting toward personalization: nearly all designers surveyed for the National Kitchen & Bath Association's 2026 Bath Trends Report named neutrals the leading bath color choice, worth keeping in mind when selecting finishes meant to last.
Any contractor on your kitchen and bath remodeling checklist should carry proper licensing, current insurance, and references from similar projects. I ask every trade partner our team works with to walk clients through their process before work begins. If you're vetting a kitchen or bathroom remodeling contractor, ask to see a project start to finish, not just the final reveal.
Most projects involving plumbing, electrical, or structural changes need a Chicago permit. Minor repairs and cosmetic updates typically do not.
Plan for 12 to 16 weeks when both spaces are done concurrently, depending on the home's age and scope.
Combining projects can lower overhead on shared trades like plumbing and electrical, but it requires one coordinated plan rather than two separate timelines.

A remodel checklist keeps a project honest, but it doesn't replace the judgment that comes from twenty years of this work in Chicago homes. If you're planning a kitchen and bathroom remodel, I'd welcome the conversation. Reach Alice Benjamin Interiors at (872) 274-2724 or admin@alicebenjamininteriors.com to schedule an initial call.